J2 Track Design Round 4

J2 Track Design Round 4

November 21

Gates open 2pm | Pit party 4pm | Racing starts 5pm

Hills College, Johanna St, College Drive, Jimboomba, Queensland

Grab your tickets online now

“The J2 track design will be totally changed from the J1 lay-out of round two of the Championship last month,” explains Bannan, who has again called in the services of leading supercross track builder, Tom Moss from Tomkaworks. “This time around we will be featuring an elevated start line, with the start gates up about three metres above the track floor, which will only make the charge to the first turn even more exciting. We are also introducing a huge sand section, which will be really long and really deep, and will really sort the men from the boys.”

Between 6,000 and 7,000 tonnes of dirt loam and sand will be utilised in the J2 track construction, with local heavy equipment supplier Finch Earthmoving providing a fleet of 30 tonne excavators, Posi track loaders and semi tippers to assist with the heavy lifting in the track building job. “Giving the riders and fans alike the best possible race track we can is a vital part of every Supercross event we produce,” says Bannan. “When the riders are pumped with the track design, it only helps to make the racing more exciting, which is precisely what the fans come to see. We’re confident the J2 track design will once again make for a thrilling night’s racing as the best riders in the country continue their battle for the 2015 Australian Supercross Championships.

Posted in Events
Top